My Report

Statistical Quality Control Practice Test 7


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. Cumulative control charts were first presented by ____________

2. If the process standard deviation increases, how will the cusum chart for monitoring process variability indicate the out-of-control state?

3. Which of these show a correct expression for the ρp?

4. Which of these can be used as the estimate of standard deviation of total variability which is including both product variability, and the gauge variability?

5. Which of these is an indication of out-of-control process with low standard deviation?

6. The tabular Cusums are made to monitor the ____________ of the process.

7. Measurement system can also cause variability in the products.

8. Tabular Cusums can be constructed for both, individual measurements, and the averages of the rational subgroups.

9. If the value of C-i-1+S2+k is lesser than (-1), what will be the value of Ci- equal to?

10. If the value of the cumulative sum shifts to a lower value what is likely to be the reason for it?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.