My Report

Statistical Quality Control Practice Test 3


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. Tolerances are said to be ________

2. The process standard deviation is given by __________

3. What is the value of LCL for the s chart when the standard value for σ is not given?

4. S chart is used to monitor _________ of a quality characteristic.

5. The inner limits in the “Two sets of limits” approach of the construction of control chart are called _____

6. Process standard deviation is necessarily equal to the sample standard deviation of the same process.

7. Once a set of reliable control limits is obtained, we use the control chart for monitoring future production. This is called __________

8. If for a process, the samples are taken 5 hrs apart and its ARL is 24.24, What will be ATS for it?

9. If we decrease the distance between LCL and UCL, what will happen?

10. Decreasing sample size will ________


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.