Software Project Management Test – 3


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. Which model is used during early stages of the system design after the requirements have been established?

2. A _________ is developed using historical cost information that relates some software metric to the project cost.

3. Which of the following states that work expands to fill the time available.

4. Which of the following costs is not part of the total effort cost?

5. It is often difficult to estimate size at an early stage in a project when only a specification is available

6. Which model assumes that systems are created from reusable components, scripting or database programming?

7. Which technique is applicable when other projects in the same analogy application domain have been completed?

8. What is related to the overall functionality of the delivered software?

9. Which of the following are parameters involved in computing the total cost of a software development project?

10. The COCOMO model takes into account different approaches to software development, reuse, etc.

11. Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools?


 

Start practicing “1000 MCQs on Software Engineering”, and once you are ready, you can take tests on all topics by attempting our “Software Engineering Test Series”.

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.