My Report

Prestressed Concrete Structures Mock Test 10


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement
 10%

Question 1 of 10

1. The repair and rehabilitation of damaged or spalled concrete is done by removing the ____________

Question 1 of 10

Question 2 of 10

2. One of the prestressed power reactor vessels in the following.

Question 2 of 10

Question 3 of 10

3. The major methods of cantilever construction are classified into how many types?

Question 3 of 10

Question 4 of 10

4. The investigations revealed that the bearings were not at ____________

Question 4 of 10

Question 5 of 10

5. One of the testing equipments used for inspection is?

Question 5 of 10

Question 6 of 10

6. Bridge girders located in zones of very severe exposure conditions suffer ____________

Question 6 of 10

Question 7 of 10

7. The depth of structural element is increased by adding ____________

Question 7 of 10

Question 8 of 10

8. The prestressing system of the dome in madras power atomic reactor vessel comprises of how many brands?

Question 8 of 10

Question 9 of 10

9. One of the example of cast insitu construction.

Question 9 of 10

Question 10 of 10

10. In the cost insitu method the least time required to move formwork is?

Question 10 of 10


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.