My Report

Petroleum Production Operations Practice Test 5


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. Which type of tools can be used to measure the density of the formation fluid at different depths?

2. For reservoir with appreciable loss of reservoir pressure, which of the following may increase the production of the well?

3. Which of the following statement is correct in the context of logging?

4. The increase in temperature is probably the most common cause of wax deposition.

5. If excess water production is a problem then Artificial will be a good solution.

6. Which of the following is correct about the noise logging tools?

7. Which of the following need not to be done as remedial measures for the sick well?

8. Noise logging tool can be used to find out tubing casing leaks.

9. To start the production the kill well process is required.

10. Which of the following statement is incorrect regarding the Wax and Asphaletens?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.