My Report

Hazardous Waste Management Practice Test 7


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. Container used for packing shall be of ___________

2. __________ from combustion of waste reduces cost.

3. What is the maximum percent of energy recovered if the steam is condensed before reintroduced to system?

4. Which of the following waste combustion furnace is opted for waste of same size and density?

5. Anaerobic treatment is mediated through _______

6. Ferrous materials are combustible.

7. Which of the following combustion technology is suitable for homogeneous and wet wastes?

8. When was HMT act passed?

9. Vehicle used for transportation shall be in accordance with ____________

10. Orange manifest copy has to be ___________


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.